Lisdrumdoagh BESS

Location: Ireland

Client Challenges

The client required a competent contractor to design and build a 60 MW (63.16 MVA) battery storage system (BESS) to provide DS3 services to the grid network. Strict deadlines for energisation were required for the project.

H&MV's Solution

  • H&MV carried out the full duties as PSCS on behalf of our client and was responsible for the project, site, and procurement management, erection, installation and commissioning, as well as QEHS.
  • The HV substation associated with the BESS comprised 110/33 kV switchgear and transformer and an interface kiosk specified by TSO (EirGrid). This included all station earthing, HV transformer cabling and installation and commissioning a UPS and Scada system.
  • H&MV were responsible for installing free-issue battery equipment, including inverters, transformers, battery storage containers, supply and installation of associated earthing, cabling and containment, and complete commissioning and preparation of the safety handover file.
Share this project
Play Video

Similar Projects