Client Challenges
As part of the CON 904 Turnkey Framework, ESB required a competent contractor for the delivery of 110 kV GIS substation at Kilnap. This project had tight timeframes for delivery which required effective and efficient project and stakeholder management.
H&MV's Solution
- H&MV Engineering were responsible for the substation, 110 kV Gas Insulated switchgear, enabling works, civil works, electrical plant, secondary and ancillary systems, testing and commissioning, High Voltage cables and ducting
- A full 3D model of the station is being prepared as part of the design the Engineering, Procurement and Construction delivery of the Kilnap rocess.
- H&MV Engineering were responsible for safety & risk management throughout the project lifecycle and produced a complete set of civil and electrical as-built drawings and handover file. Responsible for issuing the Integrated Test Plans (ITPs), Construction Management Plans, Quality Plans, Safety Management Plan and Temporary Works Register.