Monks Farm
- Case Study: Commercial & Industrial
Location: UK
Client Challenges
Amex Stadium Ltd. required a 5 MVA connection and 2 km off site 11 kV cable route for a new mixed-use housing and commercial development. There was tight timeframes and deadlines, interfacing with UKPN and outage schedules.
H&MV's Solution
- H&MV Engineering were awarded as Principal Designer and Contractor for the project. This project required effective communication with the local community and all relevant stakeholders.
- H&MV designed and gained approval from UK Power Networks (SPN) for the adoptable infrastructure network from the high voltage point of connection to two ring main units (RMUs).
- Carry out offsite excavation works and supply/install 125mm ducts where required from the point of connection to the site boundary. Responsible for issuing the CDM appointments, temporary works register, quality plans, and safety management plan. H&MV Engineering was responsible for the safety and risk management throughout the project lifecycle and produced a complete set of electrical as-built drawings and handover files.