Client Challenges
Statnett required an upgrade & extension to an existing 420, 300, 17 kV substation to be built in Skien. Constant and efficient communication and liaison between utility and relevant local authorities was of utmost importance.
H&MV's Solution
- H&MV Engineering delivered the electrical design, procurement, engineering, installation, construction, interface control, testing, and commissioning for the substation upgrade. This included full system studies and installing the primary electrical system.
- A detailed 3D model was developed during the design phase. As Principal Contractor, we managed safety and risks across the project lifecycle. H&MV produced a complete set of as-built drawings and a Safety Handover File.
- With our strong track record of upgrading critical substations, H&MV Engineering delivered the works on time while meeting the highest reliability standards through close coordination with all stakeholders. H&MV Engineering were responsible for risk management and issuing the Integrated Test Plans (ITPs), Construction Management Plans, Quality Plans, and Safety Management Plan.