Laxsjon Refurbishment

Location: Sweden

Client Challenges

Ellevio required new 130/40/10 kV transformer and line bays to be built at the existing Laxsjon substation. There was a requirement for interfaces with legacy equipment on the site with Swedish winter conditions presenting challenges.

H&MV's Solution

  • H&MV provided a design, procurement, installation, and commissioning solution for the respected Swedish brand’s primary and secondary equipment.
  • Built a new 10 kV indoor substation and built in the existing substation 130/40 kV AIS transformer and line bays
  • Responsible for issuing the Integrated Test Plans (ITPs), Construction Management Plans, Quality Plans, and Safety Management Plan. H&MV Engineering were responsible for safety & risk management throughout the project lifecycle and produced a complete set of electrical as-built drawings and handover file.
Share this project

Similar Projects