Laxsjon Refurbishment
- Case Study: Utilities, Distribution & Transmission
Location: Sweden
Client Challenges
Ellevio required new 130/40/10 kV transformer and line bays to be built at the existing Laxsjon substation. There was a requirement for interfaces with legacy equipment on the site with Swedish winter conditions presenting challenges.
H&MV's Solution
- H&MV provided a design, procurement, installation, and commissioning solution for the respected Swedish brand’s primary and secondary equipment.
- Built a new 10 kV indoor substation and built in the existing substation 130/40 kV AIS transformer and line bays
- Responsible for issuing the Integrated Test Plans (ITPs), Construction Management Plans, Quality Plans, and Safety Management Plan. H&MV Engineering were responsible for safety & risk management throughout the project lifecycle and produced a complete set of electrical as-built drawings and handover file.